10 story office building going up on the SE corner of Seymour and Pender.

Developer is Serracan, architect is ???

82,000 sq ft of office space, 90% leased so far, with tenants including Onlineshoes.com, SFU's Adler School of Psychology, and Serracon moving their offices in here.

Render:

five-ten.jpg


From today (it's still about a floor below grade):

gtVt95H.jpg
 
Last edited:
Some warm wood coloured accents are appearing on the exterior. I would've loved to have seen something like that on the Telus Garden condo tower. I'm posting a pic of the rendering on the hoarding to illustrate the exterior but not necessarily the floor count. The tenth floor pillars appear to be in the process of being poured so it will not be nine floors like the rendering.


April 5 '16, my pics


















 
Those wood accents are fantastic, I didn't notice them last time I was looking at the project. What a great way to break up the facade and showcase some natural materials with a little warmth.
 
Here's a timeline from about the last 17 months. The crane went up Aug.22 '15 and came down July 9 '16.


Feb.1 '15, my pic


July 7 '15, my pic


Nov.30 '15, my pic


Jan.16 '16, my pic


Feb.24 '16, my pic


March 14 '16, my pic


April 5 '16, my pic


April 30 '16, my pic


May 30 '16, my pic


June 24 '16, my pic


July 10 '16, my pic
 