mcminsen
Active Member
There has been a delay getting the last few floors enclosed. Word is that the windows weren't sized right for these floors that have extra height ceilings. If you look closely you can see extra small sections of spandrel (and glass?) above what looks like regular sized spandrel and glass on that topmost floor that is getting enclosed. So I wonder if they just went with what they had and added clerestory sections.
Nov.18 '16, my pics



Nov.18 '16, my pics



IMG_8873
IMG_8871
IMG_8869
IMG_8867
IMG_8866
IMG_8864
20170326_105655
20170326_105832
20170326_105837
20170326_105847
20170326_105856
20170326_110128
20170326_110003
20170326_110048