Lord Nelson Elementary Redevelopment | 13m | 3s | Board of Education | IBI/HB

Roundabout

Senior Member
Member Bio
Joined
Jul 23, 2007
Messages
4,210
Reaction score
1,557
Current Status
  • a replacement (new) school is planned
    • the replacement school will be located east of the current building, with the main entry on Garden Street
  • design work is complete
Next Steps
  • Development and Building Permits are being processed by the City of Vancouver
  • Public tendering to obtain a contractor to begin construction
Temporary Accommodation
  • Not required. The school will continue to function in the existing building until the new building is ready.
http://www.vsb.bc.ca/sites/default/files/shared/Introduction Presentation.pdf

cpp-time-8.png


20161026_155645.jpg


20161026_155722.jpg
 

Attachments

  • 20161026_155645.jpg
    20161026_155645.jpg
    1.6 MB · Views: 810
  • 20161026_155722.jpg
    20161026_155722.jpg
    1.1 MB · Views: 1,483
  • cpp-time-8.png
    cpp-time-8.png
    15 KB · Views: 548

Back
Top