Forums
New posts
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Calendar
Log in
Register
What's new
Search
Search
Search titles only
By:
Current visitors
New profile posts
Search profile posts
Menu
Log in
Register
News
Apr 02, 2020
A Message to Our Readers
3.5K
0
News
Apr 01, 2020
Topping Off March 2020: What's Hot on SkyriseVancouver
4.4K
0
News
Apr 01, 2020
News Roundup for April 1, 2020
1.3K
0
Members
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Voltz's latest activity
V
Voltz
reacted to
T3G's post
in the thread
Sheppard Line 4 Subway Extension (Proposed)
with
Like
.
A few months ago, someone did the maths on this: Post in thread 'Toronto | 1 Eglinton Square | 158.8m | 46s | KingSett Capital | BDP...
Friday at 6:45 PM
V
Voltz
replied to the thread
Sheppard Line 4 Subway Extension (Proposed)
.
If there has ever been a ridership study that demonstrates a Sheppard subway will have sufficient ridership, especially enough to make...
Wednesday at 2:16 PM
V
Voltz
reacted to
afransen's post
in the thread
Sheppard Line 4 Subway Extension (Proposed)
with
Like
.
If transfers are no biggie, why does Sheppard East need to be subway? Let's do surface LRT and save a few billion.
Wednesday at 2:01 PM
V
Voltz
reacted to
Chris R.'s post
in the thread
Hamilton
Toronto | Hamilton Line B LRT | ?m | ?s | Metrolinx
with
Like
.
LRT will have signal priority. Non-issue for a line crossing through 36 intersections. Adding one additional intersection to cross is...
Apr 20, 2024
V
Voltz
reacted to
Admiral Beez's post
in the thread
Toronto
Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited
with
Like
.
The Terminal Link train should go to the Malton GO station. It's nuts that we have a regional GO train station beside the airport, with...
Apr 15, 2024
V
Voltz
reacted to
Islington Express Bus's post
in the thread
Toronto
Toronto | Union Pearson Express | ?m | ?s | Metrolinx | MMM Group Limited
with
Like
.
"Are you taking UP Express Local or UP Express Express?"
Apr 15, 2024
V
Voltz
reacted to
crs1026's post
in the thread
GO Transit: Construction Projects (Metrolinx, various)
with
Like
.
^ It half works if the Stouffville line runs "wrong main" - ie eastward trains on the northmost track - because then westbound locals...
Apr 10, 2024
V
Voltz
reacted to
Bojaxs's post
in the thread
Roads: GTA West Corridor—Highway 413
with
Like
.
This is why I really want to see a freight bypass for CP rail get constructed alongside the 413. It won't be long before warehouses and...
Apr 8, 2024
V
Voltz
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
Their design for the grade separation at Scarborough Junction only had three tracks continuing east on Lakeshore, with no apparent room...
Apr 2, 2024
V
Voltz
reacted to
T3G's post
in the thread
VIA Rail
with
Like
.
Subways, subways, subways was a culture war that pitted the latte sipping downtown condo dwellers against the honest, hard working...
Apr 1, 2024
V
Voltz
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
Someone should remind them they had rebuilt Guildwood Station with room for a fourth track a few years ago, and then seemed to just forget.
Apr 1, 2024
V
Voltz
reacted to
turbanplanner's post
in the thread
TTC: Flexity Streetcars Testing & Delivery (Bombardier)
with
Like
.
I've worked in a lot of places, and the ones that "didn't have time" for aesthetics pretty much always had an attitude of fix it, who...
Apr 1, 2024
V
Voltz
replied to the thread
GO Transit: Construction Projects (Metrolinx, various)
.
There will be four tracks until the Stouffville line splits off, so the work must be for adding another track.
Apr 1, 2024
V
Voltz
reacted to
dowlingm's post
in the thread
VIA Rail
with
Like
.
That land already has a useful and necessary purpose - agriculture.
Mar 31, 2024
V
Voltz
reacted to
T3G's post
in the thread
Toronto
Toronto | Crosstown LRT | ?m | ?s | Metrolinx | Arcadis
with
Like
.
I will add this: the two main causes of bunching at the TTC are either blockages, either caused by one vehicle on the line being blocked...
Mar 26, 2024
Members
Back
Top